|   | the minizagi with battery positioned for CG determinization 
 
       | 
|   | minizagi nose 
 
       | 
|   | pushrod 
 
       | 
|   | nose 
 
       | 
|   | a SWIFT glider at Fort Funston 
 
       | 
|   | SWIFT 
 
       | 
|   | SWIFT 
 
       | 
|   | SWIFT going to the south 
 
       | 
|   | SWIFT on final 
 
       | 
|   | SWIFT flaring 
 
       | 
|   | landing 
 
       | 
|   | pilot working his way out of the cockpit 
 
       | 
|   | a helper 
 
       | 
|   | walking over to the teardown area 
 
       | 
|   | walking 
 
       | 
|   | flaps 
 
       | 
|   | cockpit 
 
       | 
|   | cockpit 
 
       | 
|   | airfoil 
 
       | 
|   | placard (Va = 65 mph!) 
 
       | 
|   | red herring parts on scale 
 
       | 
|   | red herring parts on scale 
 
       | 
|   | 101.6 grams before covering 
 
       | 
|   | 101.6 grams before covering 
 
       | 
|   | electronics (still need to add wire and pushrods) 
 
       | 
|   | John 
 
       | 
|   | minizagi and hitec eclipse 
 
       | 
|   | eclipse and minizagi 
 
       | 
|   | Butterfly wings 
 
       | 
|   | John and his butterfly 
 
       | 
|   | John and his butterfly 
 
       | 
|   | John and his butterfly 
 
       | 
|   | John and his butterfly 
 
       | 
|   | John and his butterfly 
 
       | 
|   | the 2x4 (still repairable, but temporarily broken) 
 
       | 
|   | ballast 
 
       | 
|   | John and his butterfly 
 
       |