waiting for the outage 2
waiting for the outage 2                Up

titlewaiting for the outage 2
descriptionGeorgia Tech and Turner Construction workers wait for the 5:15pm cutoff of power to begin work on a damaged 4kV power line
aperture3.7
date captured2001:11:28 17:06:53
exposure bias0.00
exposure index200
flash firedNot Fired
fnum3.8
focal length_mm12.60
height1168
maker note0106030101000000ffffffff07d10b1c110635430002000000
max aperture3.7
meteringAverage
exposure1/60
shutter speed1/64
width1760
filenamedcp_4811.jpg